D.5.2 Dynamic Priorities for Protected Objects
1/2
{
AI95-00327-01}
This clause specifies how the priority of a protected
object can be modified or queried at run time.
Static Semantics
2/2
{
AI95-00327-01}
The following attribute is defined for a prefix
P that denotes a protected object:
3/2
P'Priority
{
AI95-00327-01}
Denotes a non-aliased
component of the protected object P. This component is of type System.Any_Priority
and its value is the priority of P. P'Priority denotes a variable if
and only if P denotes a variable. A reference to this attribute shall
appear only within the body of P.
4/2
{
AI95-00327-01}
The initial value of this attribute is the initial
value of the priority of the protected object[, and can be changed by
an assignment].
Dynamic Semantics
5/2
{
AI95-00327-01}
If the locking policy Ceiling_Locking (see D.3)
is in effect then the ceiling priority of a protected object P
is set to the value of P'Priority at the end of each protected
action of P.
6/2
{
AI95-00445-01}
If the locking policy Ceiling_Locking is in effect,
then for a protected object P with either an Attach_Handler or
Interrupt_Handler pragma applying to one of its procedures, a check is
made that the value to be assigned to P'Priority is in the range
System.Interrupt_Priority. If the check fails, Program_Error is raised.{Program_Error
(raised by failure of run-time check)}
Metrics
7/2
{
AI95-00327-01}
The implementation shall document the following
metric:
8/2
- The
difference in execution time of calls to the following procedures in
protected object P:
9/2
protected P is
procedure Do_Not_Set_Ceiling (Pr : System.Any_Priority);
procedure Set_Ceiling (Pr : System.Any_Priority);
end P;
10/2
protected body P is
procedure Do_Not_Set_Ceiling (Pr : System.Any_Priority) is
begin
null;
end;
procedure Set_Ceiling (Pr : System.Any_Priority) is
begin
P'Priority := Pr;
end;
end P;
10.a/2
Documentation Requirement:
The metrics for setting the priority
of a protected object.
11/2
34 {
AI95-00327-01}
Since P'Priority is a normal variable, the value
following an assignment to the attribute immediately reflects the new
value even though its impact on the ceiling priority of P is postponed
until completion of the protected action in which it is executed.
Extensions to Ada 95
11.a/2
{
AI95-00327-01}
{
AI95-00445-01}
{extensions to Ada 95} The
ability to dynamically change and query the priority of a protected object
is new.